Building work required prior to the delivery of your Teak Hottub.
Base
A 4-inch concrete base or concrete slab, level and flat, the size of the
tub.
Power
A single phase 240 volt 40 amp power supply with 30ma RCD (ELCB) isolator
fitted by your fuse board and a suitable cable laid to the site with an
extra 4 meters of loose cable to connect into the control panel.
Water
A method of filling the tub. Preferably off the rising main. A garden
hose is quite adequate, also used for emptying.
If
you are unsure about any of the site preparation details given here, call
us.
|